25/9/00089/MOD decided approve
Last updated 10/07/2025, 16:07
Application for facade remediation works including new panelling and window alterations. Non-material amendment to 23/07318/FU to include metal louvres at roof level, glazing behind louvered section of AOV, revised AOV design for compliance, and high-level PPC aluminium spandrel panels with ventilation grills.
Non Material Amendment
Woodhouse Lane, Leeds, LS2 9PD
LS2 9PDFull Proposal
Facade remediation works including new panelling and alterations to existing windows - NON MATERIAL AMENDMENT TO 23/07318/FU - Metal louvres at roof level to match new design for windows; Glazing added behind louvered section of AOV. To match new window design; AOV design to first floor revised to provide regulation compliant free openable area; High level PPC aluminium spandrel panels introduced to first floor curtain walling to contain ventilation grills and allow for termination of Corten cladding soffit. Colour to match window frames. All other glazed and non glazed panels replaced with like for like.
Application Timeline
- Application Registered
- N/A
- Application Validated
- 16/04/2025
- Target Decision Date
- 11/05/2025
- Committee Date
- N/A
- Decision Made
- 12/05/2025
- Decision Issued
- 12/05/2025
Applicant
Unite Students