Application to upgrade the existing rooftop telecommunications installation by removing 6 antennas and replacing them with 12 antennas on 3 tripods, along with 2 dishes, 1 GPS module, 3 cabinets, and associated works. This is a non-material amendment to 24/03844/FU, involving relocation of equipment within the existing boundary.
Non Material Amendment
8, Otley Road, Leeds, LS6 2AD
LS6 2ADFull Proposal
Upgrade the existing roof top telecommunications installation including removal of 6 existing antennas and replace with 12 antennas fixed to 3 tripods and support poles together with 2 x 300 dishes, 1 GPS module, 3 cabinets and associated ancillary works, one existing GPS module to be relocated NON MATERIAL AMENDMENT to 24/03844/FU Relocation of proposed equipment within the existing red line boundary, as follows: - The proposed 2 no. antennas on a tripod located at the southwest corner of the building are to be relocated to the southwest elevation. The antenna height above ground level (AGL) remains unchanged at 22.10 m. - The proposed 2 no. antennas on a tripod on the northeast elevation are to be relocated further south along the same elevation. The antenna height AGL remains unchanged at 22.10 m. - The proposed 2 no. antennas on a tripod on the northwest elevation plant room are to be relocated to the position of existing steelwork, which will support a total of 4 no. antennas. The antenna height is reduced from 25.25 m to 24.37 m. - The remaining 4 no. antennas will remain in their approved locations on either side of the plant room. - The proposed 3 no. cabinets are to be relocated from the south of the building, where they were previously shown on a new freestanding frame, to the existing grillage adjacent to the existing VMO2 cabinet. - The proposed 1 no. 300 mm dish and 1 no. GPS module are to be relocated with the antenna on the southwest elevation, and the proposed 1 no. dish is to be relocated with the antenna on the northeast elevation. - The proposed amendments are confined within the existing red line boundary, and the description of development remains unchanged.
Application Timeline
- Application Registered
- N/A
- Application Validated
- 04/02/2026
- Target Decision Date
- 01/03/2026
- Committee Date
- N/A
- Decision Made
- N/A
- Decision Issued
- N/A
Applicant
Cornerstone Telecommunications Infrastructure